Marbella · Estepona · Mijas · Benahavís · Fuengirola · Málaga

Turnkey home renovation on the Costa del Sol

Full-cycle main contractor: design, permits, works, handover. A fixed price written into the contract. A 10-year structural guarantee under Spanish law.

Message us on WhatsAppEnglish · Español · Polski · Русский · Українська
A house on the Costa del Sol after renovation

Why people come to us

01

You are looking at a property and have no idea what it will cost after the purchase

The listing price is half the sum. The other half becomes visible once the structure is opened up, and it is usually larger than expected. We survey the property before the deal: structure, damp, wiring, whether existing alterations can be legalised. You get the real cost of entry rather than a guess.

02

You own a property and want to bring it up to standard

The layout does not suit you, the services are worn out, the electricity bills are beyond reason. We carry out full renovations: from replanning and building services to finishes, energy efficiency and home automation. One contract, a fixed price, one party responsible.

03

The build or the refurbishment has stalled

The contractor vanished, missed the deadlines, or an inflated budget made carrying on impossible. The site sits idle, the licences are open, and nobody can say what was done or how well. We take over unfinished projects: a technical audit of the work done, a fixed budget for what remains, closing the permits, taking it through to handover.

The full cycle — from the plot to the keys

We do not coordinate subcontractors, we do the work. Architecture, engineering, procurement, construction and paperwork sit inside one company.

  1. 01

    Finding the property

    We help you choose a house or a plot that fits the brief — to live in or to invest in. With a technical assessment, not just photographs.

  2. 02

    Technical audit

    A survey of the property: structure, damp, wiring, building services, whether existing alterations can be legalised. A renovation budget before you commit.

  3. 03

    Architectural design

    The design, the layouts, the feasibility study and the working drawings.

  4. 04

    Licences and permits

    We establish the route — obra menor or obra mayor — prepare the documents and handle the town hall. We do not start work without the right permit.

  5. 05

    Construction and renovation

    Demolition, structure, building services, finishes. To an approved programme with control points.

  6. 06

    Interior and landscape design

    The interior design, the selection of materials and furniture, landscaping, the pool.

  7. 07

    Building services and smart home

    Climate, electrics, water, automated lighting, shading and security.

  8. 08

    Energy efficiency

    Envelope insulation, glazing, aerothermal systems, solar generation. There is a separate section below.

  9. 09

    Handover

    The final licence, the documents, handing the property over.

  10. 10

    Maintenance

    Looking after the property after completion.

A renovation with no surprises in the budget

Renovation on this coast has a deservedly bad reputation: budgets double, deadlines slip by a year, contractors disappear along with the deposit. We have set the work up so that each of those problems is answered by the contract rather than by a promise.

A fixed price in the contract

Itemised, with IVA included. Not an estimate and not a “from”. Changes are possible only with your written approval — with the new figure agreed before the work starts, not after it is done.

Guarantees under Spanish law

LOE Ley 38/1999: 10 years on the structure, 3 years on building services, 1 year on finishes. The guarantee only holds if the work is invoiced officially with a factura — with us that is not optional. Without an invoice you can recover nothing, and many people learn that far too late.

One contract for the whole cycle

No hiring the architect separately and the builders separately, then watching them argue about who missed the date. One point of responsibility.

Legal works

We establish the permit route and run it. Legalising after the fact costs more and is sometimes impossible — and it surfaces years later, when you sell.

A programme with control points

Stages, dates, areas of responsibility. You can see where the project stands without visiting the site.

Remote oversight

Most of our clients live between countries. Regular photo and video reports, and a direct line to the project lead on WhatsApp.

Who we are

AURA Developers

A full-cycle main contractor based in Marbella. We work across the Costa del Sol within roughly a hundred kilometres: Marbella, Estepona, Mijas, Benahavís, Fuengirola, Málaga.

We run projects from finding the property to maintenance after handover. We build new houses, renovate existing ones and take on unfinished construction. We work with houses, townhouses and apartments from 100 m².

We work in English, Spanish, Polish, Russian and Ukrainian. That matters when you are signing a contract worth hundreds of thousands of euros and would rather read it yourself than through an interpreter.

Townhouses on the Costa del Sol

Six stages

  1. The conversation

    You message us on WhatsApp, we establish the property details and the brief. A few minutes.

  2. Site visit and survey

    An inspection, measurements, an assessment of the structure and services, a check of the paperwork and of what can be legalised.

  3. The proposal

    The scope broken down by stage, an itemised price, a programme, the permit route. A document, not a figure over the phone.

  4. Contract and design

    The price and the dates written into the contract. Design documentation, permit applications.

  5. The works

    To the approved programme. Photo and video reporting, the project lead available.

  6. Handover

    Commissioning, the final licence, the documents, the guarantee obligations.

A separate discipline

Renovation that reaches class A or B

Houses built on this coast before 2005 are almost always configured the same way: a façade with no external insulation, glazing with no thermal break, split-system air conditioning. In a building like that the air conditioning is not working for comfort — it is compensating for losses, constantly.

If you are renovating anyway, energy efficiency is worth designing in from the start. The same works cost more on their own: nobody wants to open up the façade and replace the services twice.

What it gives you

A new CEE certificate at class A or B. According to the Bank of Spain, class A and B properties sell for an average of 9.7% more than comparable class F and G properties. For detached houses the gap widened from 5.4% in 2017 to 18.3% in 2022.

On top of that, works that improve energy efficiency qualify for an IRPF deduction — a rate of up to 40% where the property reaches class A or B. The conditions: the works and the payment completed before 31 December 2026, and the post-works certificate issued before 1 January 2027. The deduction applies to a main residence and to property let on a long-term basis.

Completed projects

BeforePrivate house #PV1 — Before
AfterPrivate house #PV1 — After
Private house #PV1456 m², plot 1,207 m²Full renovation: demolition, a column replaced with a structural steel frame, HVAC, electrics, finishes, landscaping11 months
BeforePrivate house #PV3 — Before
AfterPrivate house #PV3 — After
Private house #PV3820 m², plot 16,200 m²Interior finishes, a kitchen with a stone island, bathrooms, lighting, terraces and the pool area, an EV charging point13 months
BeforePrivate house #PV4 — Before
AfterPrivate house #PV4 — After
Private house #PV4457 m², plot 12,000 m²An update that keeps the classical architecture: façade elements, living areas, kitchen, bathrooms, terraces, pool, landscaping20 months
BeforeApartment #PA3 — Before
AfterApartment #PA3 — After
Apartment #PA3187 m²Interior works: kitchen-living room, bedrooms, bathroom, storage, finishes and integrated lighting15 months
Apartment #PA2
Apartment #PA2200 m²A renovation with a sea view: finishes, stone worktops, a new kitchen, electrics and lighting6 months
Private house #PV2
Private house #PV2350 m², plot 1,000 m²Full renovation under an obra mayor licence: demolition, building services, finishes, landscaping

Frequent questions

How much does a renovation cost?

It depends on the area, the condition of the property and the scope. The gap between a cosmetic refresh and a full renovation with new building services is a multiple, not a percentage. We give the exact figure after the survey, as an itemised price. Before the survey any number would be a guess, and we do not write contracts on guesses.

Is the price really not going to grow?

The price is fixed in the contract. It can change only where something is found that physically could not be seen before the structure was opened up. In that case you receive a new figure and approve it before the work continues, rather than after the fact. That is exactly why we insist on a survey before signing: the more accurate the starting data, the rarer those situations.

Is IVA included in the price?

Yes. Renovation is taxed at 21% and it is inside the figure in the contract. Offers “without VAT” are cheaper by precisely that amount, but they cost you the guarantee: without a factura, Spanish law gives you nothing to enforce.

Can we pay as the work is done rather than up front?

Payment is split into stages tied to work actually completed. The payment schedule is fixed in the contract alongside the price.

Who deals with the permits?

We do. We establish the route — declaración responsable, obra menor or obra mayor — prepare the documents and run the approvals. We do not start work without the right permit.

How long does it take?

A full house renovation runs from five to twelve months depending on the area and the scope, plus four to ten weeks for design and permits. The exact programme is part of the proposal.

Do we need to move out during the works?

For a full renovation, yes. For partial works it depends on the scope, and we will say so plainly at the pricing stage.

I do not live in Spain. How do I keep track?

The same way most of our clients do: photo and video reports, a programme with control points, a direct line to the project lead. You need to be there in person for the signing and for the handover.

Will you finish work started by another contractor?

Yes, that is one of the things we do. We start with a technical audit of what has been built: what was done, to what standard, and what has to be redone. Then we fix the remaining budget and sort out the permits.

Do you work with apartments?

Yes, from 100 m². With one caveat: works affecting the façade, the roof or shared services require a decision from the owners’ community. Inside the apartment there are no such limits.

Start with a conversation

Message us on WhatsApp — we will establish the details of the property, arrange a site visit and prepare a proposal with an itemised price. It commits you to nothing.